2016 – 2017 – WWTP Daugavgriva primary and secondary settling basin rehabilitation design
Within the scope of the contract our company has developed detailed technical design for electrical power supply, instrumentation and control of six preliminary settling basins and ten secondary settling basins of Wastewater Treatment Plant “Daugavrgriva” in Riga, Latvia.
Technical solutions included power supply arrangement via sliprings in the moving part of the central column and wireless data transfer from local automation controller to plant-wide control system, with foreseen integration into existing SCADA system.