2024 – Development of documentation for the procurement for the modernization of the control and automation system (SCADA) of Daugavpils wastewater treatment plant
Within the scope of the contract our company has performed feasibility study and prepared package of procurement documents (Technical Specification / Specific Employer’s requirements) for the modernisation of Daugavpils WWTP control and automation systems.
Daugavpils WWTP ensures wastewater treatment of 22 000 m3/day, having capacity of 120000 PE.
Technological process includes:
- • 1 Bio-P system + chemical precipitation;
- • 2 anoxic distributors;
- • 4 aeration tanks;
- • 4 secondary settling tanks;
Sludge treatment facilities.