2024 – Development of the technical specification for the procurement for the modernization of the control (SCADA) system of wastewater treatment plant of city of Ventspils
Within the scope of the contract our company has performed feasibility study and prepared package of procurement documents (Technical Specification / Specific Employer’s requirements) for the modernisation of Ventspils WWTP control and automation systems.
Ventspils WWTP ensures wastewater treatment of 19 200 m3/day, having capacity of 80000 PE.
Technological process includes:
- 2 Bio-P systems;
- 4 aeration tanks;
- 2 secondary settling tanks;
- Sludge treatment facilities.